autonomous   fuel-free   ELECTROMAGNETIC   GENERATOR

Russian

The Business Management

Home

MainIdea

Preface

Info

Content

Application

Economy

Prototype

Shares

Bussiness

Comparison

About

 

I have no doubt that the magnetic motors are functionally operative. Nevertheless, they are not being implemented. There may be many reasons for this (various theories of plots or conspiracies and organized  opposition, secrecy, suspicion of fraud, etc). However I think  that the main reason is  the absence of  a compelling theory of functioning:

bullet

 a conspicuous violation of the energy conservation law provokes opposition of a whole army of experts against the idea,

bullet

lack of calculation methods doesn't allow to organize mass production.

I think that I have created a full theory of functioning. It

bullet does not contradict the existing physical paradigm,
bullet reveals the source of energy (it is the air space),
bullet is confirmed by known experiments,
bullet contains calculation methods and experimental programs.

 

Contents

1. The State of Affairs

2. Top-priority Tasks

3. The Performers of Top-priority Tasks

4. Approximate Time of Top-priority Tasks Completion

 

1. The State of Affairs

      There exist experimental devices of Searl and Roshchin-Godin, proving the possibility of functioning of an autonomous generator built on the base of permanent magnets.

      A full theory of the generator within the existing physical paradigm is developed.  

      The coincidence of theoretical conclusions with the experimental results of Searl and Roshchin-Godin (there is no other theory for these results explanation).

      Our own limited experiments consistent with the Searl and Roshchin-Godin experiments have been performed.

      The present project has been developed, its content is described in chapter 6.

 

2. Top-priority Tasks

      Establishing a design office with pilot-scale production

      The design of  a first generator with adjustable characteristics

      Developing the design drawings of the generator

      Manufacturing, adjustment, tests of the generator

      International patenting

  

3. The Performers of Top-priority Tasks

      The author, candidate of technical science

      Consultant, physicist, doctor of physics and mathematics

      Specialist in thermal physics

      Electrician

      Programmer

      Design engineer

      Fitter

Total 7 persons

 

4. Approximate Time of Top-priority Tasks Completion

      Patenting  2 months

      Developing and  testing the first generator - 6 months